Buying guides · Change notices
Check the notice against the exact ordering code.
By VEQORIN · Published
A notice about a component can change what you need to ask in an RFQ. Start with the complete ordering code on the approved parts list, then check whether that exact code appears in the manufacturer's notice. A family name alone may cover more than one orderable model.
First, identify the kind of notice
A product change notice (PCN) describes a change to a product or its manufacturing process. It is not, by itself, a statement that the part has been discontinued. A product discontinuance notice (PDN) addresses withdrawal and normally identifies affected models and dated purchase or shipment milestones. Texas Instruments explains the information in its notices; Analog Devices describes its PCN and PDN process separately. Apply the actual manufacturer's notice to the actual MPN, rather than borrowing another manufacturer's timetable.
Read the affected part list, not just the headline
Record the notice number, publication date and any revision. Compare its affected-products list with the full MPN, suffix and package on your BOM. A notice about a generic product family does not automatically settle the status of every orderable model. ADI explicitly distinguishes a generic number from a specific model in its life-cycle guidance.
If the notice names a replacement, keep it as a proposal for engineering review. Similar naming or a manufacturer's suggested alternative does not by itself approve a pinout, specification or application substitution.
Carry the dated facts into the enquiry
| Record | Why it matters |
|---|---|
| Exact identity | Manufacturer, complete MPN, ordering suffix, package and required quantity. |
| Notice | Manufacturer notice number, publication date, any revision, link or original document, and affected-model entry. |
| Timing | Any last-order or last-shipment date stated for that model; do not assume a generic window applies. |
| Approval | Whether the design owner allows a changed version or has approved a named alternative. |
Product status labels also differ: TI distinguishes active, not recommended for new designs, last time buy and obsolete in its life-cycle guide. A status label is a reason to verify the current manufacturer record, not a live stock statement from VEQORIN.
Ask for a response tied to the same MPN
Send the notice with your BOM line and request confirmation of the exact proposed item and available commercial terms. If the proposed code differs, ask for the difference to be written out for the design owner. You can check the complete MPN and prepare an RFQ; neither step replaces the manufacturer's current notice or engineering approval.
